Reference · 03.08.26
In Waxeneck Lower Austria, another geothermal project with separatus was successfully implemented. Together with WTC Brunnen & geothermal energy and the installation company Fluid Energy, two borehole heat exchangers were created, each with a depth of 100 metres. separatus took over thermal simulation and hydraulic design. The coordinated planning, the simple connection and the compact probe design reduced the installation effort and increased the process reliability. The project shows the added value of the separatus partner network from planning to commissioning.
View project
Reference · 22.07.26
Six borehole heat exchangers à 60 metres for a holiday home on the Bartholomäberg: location-based simulation, adapted drilling sequence and clear project roles.
View project
Reference · 25.06.26
For the construction of a new multi-family building in Switzerland, 11 drilling piles à 9 metres were activated with separatus probes into energy piles. The pit protection thus becomes part of the heat supply in the long term and complements the existing borehole heat exchangers. This saves space, reduces additional drilling and increases the efficiency of the geothermal plant.
View project
Reference · 28.08.25
A single-family house from 1954 in Klaus was converted from oil and wood to geothermal energy. The existing garden was preserved according to the project report.
View project
Reference · 26.03.25
Two 90 metre deep drillings on the same single-family house document different probe designs. Comparable power series are not available.
View project
Reference · 15.10.25
In Clavadel near Davos, a sophisticated geothermal plant with 30 separatus borehole heat exchangers à 40 m was successfully implemented. Despite the artesian strained groundwater and difficult alpine geology, MR Erdwärme together with separatus was able to realise an economical and reliable geothermal solution for several holiday apartments.
View project
Reference · 10.04.26
So goes geothermal energy in case of renovation. In Wangen im Allgäu, separatus together with BauGrund Süd and Geser shows how efficient geothermal energy with reduced drilling diameter can be achieved. The innovative borehole heat exchanger (BHE) enables faster drilling, lower costs and a reliable heat supply. Ideal for modern new buildings and renovations with a focus on economic efficiency and sustainability.
View project
Reference · 24.06.26
Near Brno, two 140 metre deep separatus borehole heat exchangers were installed by EMBRA Drilling. In the future, the plant will provide a multi-family house with sustainable heat and cooling. The first project in the Czech Republic was a success.
View project
Reference · 01.04.25
The first realised test facility has been since 6. December 2023 in operation. The single-family house from the 90-ers was previously heated with an aged Gastherme. Just at the time when the owners of the home in Altach, Austria, decided to modernize the heating
View project
Reference · 25.04.25
With the first geothermal plant in Trimmis, we are celebrating two premieres. It is our first project in the Swiss market and the first plant we have planned with the GHEtool.
View project
Reference · 14.07.25
First separatus plant in Belgium for geothermal energy under tight space conditions With only 90 mm drill diameter, the project with BruDrill shows how geothermal energy can be efficiently implemented even with little space. Ideal for compact installations in densely built urban areas.
View project
Reference · 12.06.25
We have waited a long time for this, now it is time. The first separatus borehole heat exchanger in Switzerland became a reality. For a holiday home with a far-sighted view of the Bündner mountain world, it now supplies climate-friendly energy directly from the ground for the next generations.
View project
Reference · 12.08.25
geothermal energy with separatus in Brussels With only 90 mm drill diameter, a separatus probe was efficiently installed in a narrow city quarter. The compact solution shows how geothermal energy is possible even with little space.
View project
Reference · 24.04.25
In the Netherlands, deep drilling for geothermal systems is often restricted – among other things to protect groundwater and due to existing gas reserves. But even with a limited drilling depth, geothermal energy is possible: separatus energy piles offer a clever and efficient solution.
View project